Conflict is always present between stakeholders in any project, but there are different conflict levels that require an appropriate response. Not all conflicts should be treated the same, and as a project manager, understanding the conflict level
According toย Speed Leas, conflict begins to form and escalates in a pattern that is predictable. Having a continued conflict starts with a problem that needs to be solved and escalates to a world war, which is the worst-case scenario.

Level 1: Problem to Solve
Some of the signs of problems are that language is communicated with good intentions, as well as being constructive. It is motivated by sharing information and collaborating with someone else to fix the problem.
Another sign of level 1 conflict would be when facts are utilized as a means of backing up an argument. The environment of a team in this current level of conflict will still find itself to be relatively optimistic and is capable of moving through the conflict. It is more closely defined as being affective conflict within teams that are high performing.
Signs
- Language is generally open-hearted and constructive.
- People use facts to back up the argument.
Response Options
- Collaboration: Look for a win-win situation.
- Consensus: Look for a solution everyone can agree on.
Level 2: Disagreement
While level 2 isnโt considered a hostile level of conflict, it is designed with the intent of building a wall. A sign of a disagreement would be having language that is geared more towards protecting oneself.
The premise is that the protection of self takes precedence over collaborating with others. The language in a level 2 conflict will find itself more guarded and a lot less direct, so it can be open to interpretation. This represents itself in a project team by members making the decision to distance themselves or take a position that they believe will be for a compromise. Underlying conflicts may find themselves emerging to build into level 3.
Signs
- Language is self-protection.
Response Options
- Support: Empower the team to resolve disagreements themselves.
- Safety: Use collaboration games to reinforce team shared values.
Level 3: Contest
Level 3 conflict is when factions begin to emerge. Misunderstandings and power politics will make an appearance, and people will begin to align themselves by picking a side. A sign of a contest is where the language would be manipulated to the point where presumptions are made and over-generalization forms.
The language in a level 3 conflict resorts to personal attacks with the goal of winning in the conflict instead of resolving the conflict. Some examples of this may be โHe always forgets to turn off the system before he leaves our meetingsโ or โYou always interrupt me when I have some input to shareโ. Team members will also view themselves as well-meaning, while the rest of their team isnโt.ย
Signs
- Language is distorted where presumptions are made and over-generalisation.
Response Options
- Accommodate: Yield to others’ viewpoints as the relationship is more important than the issue.
- Negotiate: If an issue is โDividableโ then negotiation can work.
- Get Factual: Gather data on an issue to get facts.
Level 4: Crusade
The signs of a crusade are when conflict transitions to become polarized and ideological. The focus now shifts to protecting oneโs own group. At this level, the premise of just having a solution isnโt enough, and the only option that exists is for team members to remove themselves from the team completely.
The factions that were created in level three now have more solidification and see the other team as the enemy. Everyone who isnโt a part of their faction is being attacked solely for who they are affiliated with, not for the ideas that they have. Groups will also see themselves as righteous.ย
Signs
- The conflict becomes ideological and polarised.
Response Options
- Diplomacy: Be a facilitator between two groups as all communication has broken down.
- De-escalate: Try to lower the level of conflict.
Level 5: World War
Having a world war conflict is when language tends to no longer exist at level 5. The goal in this level ofย conflict is to destroy the other (lose-lose). At this point, there isnโt any constructive outcome that can be obtained at this level. The position that is taken is that winning is not enough and that others have to lose because of this; the only option that exists at this level is to separate team members so that they donโt hurt each other, as violent conflict can occur.
Signs
- Language is little or non-existent.
Response Options
- Unresolvable: Sometimes, when it gets to level 5, the conflict is unresolvable, and you need to figure out a way everyone can remain working without hurting each other.
Conflict Resolution
A main goal that a project manager should have with conflict arises within their team is to have methods forย conflict resolutionย available. But it is also important for a project manager to know when to identify when it is appropriate to step back or to step in. Team members in agile teams are capable of being able to navigate through conflict on their own. Take this opportunity to see if there is progress occurring. This is so that your team can grow and have the ability to learn how to resolve conflicts themselves.ย
If, however, you decide that it is time to intervene, it is important for you to utilize response modes that require analysis and response, the use of structures, and reveal.ย
Major Sources of Conflict in Project Management
Analyze and Respond
It is important to remember that when it comes to being in analyze-and-respond mode, the entire story is unknown. Consider that every perspective is valid and necessary for resolution. Each team member has their own perspective that should be considered.
Some questions to consider in this mode:
- What is the conflict level?
- What are the presented issues?
- In what way would I respond as side 1?
- In what way would I respond as side 2?
- Are there any open options for resolution?
- What should I do at this point?
Make a table for resolution options after you identify the conflict levels. Once the team is able to de-escalate, there are now additional options available to them for dealing with the conflict the next time it arises.ย
It is recommended that the resolution type that you select for your team is one that leads to a win-win solution for all parties involved. This helps eliminate continued conflict. An additional tool that is beneficial for project managers is understanding the organizational Conflict Model.
The Conflict Model, which describes the methods for how people think, feel, and act in the presence of conflict, is helpful for managers to understand so that they can learn to be able to effectively navigate through conflict resolution for their team and organizational conflicts.
Suggested articles:
- Task Conflict vs. Relationship Conflict
- How to Get Your First IT Job: A Step-by-Step Guide
- Top 5 Salesforce Sharepoint Integration Issues and How to Fix Them
Shane Drumm, holding certifications in PMPยฎ, PMI-ACPยฎ, CSM, and LPM, is the author behind numerous articles featured here. Hailing from County Cork, Ireland, his expertise lies in implementing Agile methodologies with geographically dispersed teams for software development projects. In his leisure, he dedicates time to web development and Ironman triathlon training. Find out more about Shane on shanedrumm.com and please reach out and connect with Shane on LinkedIn.